Owasso City Hall Leaks 11/04/24

Court Department Leaks The counterflashing that extends over the lower roof has a caulk joint on the top side that has failed in several places over time. The recommendation for repair would be to remove and replace the sealant on the top of the counterflashing. The budget would be roughly $1,500.00 for this repair

Expansion joint between upper and lower roof.

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:32am
Creator: Josh Rhodes

Wood on expansion joints shows leak has been going on for several years.

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:35am
Creator: Josh Rhodes

CONTD

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:35am
Creator: Josh Rhodes

Control joint in wall on north side of last set of windows is wet and appears to be main source of water.

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:40am
Creator: Josh Rhodes

Expanded View of Leak

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:40am
Creator: Josh Rhodes

Photo of underneath the counterflashing.

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:40am
Creator: Josh Rhodes

IT Leak

The RTU curb has flashings leaking above IT and the pitch pan on the east side could have the sealant topped off as well. Recommended repair would be to coat the RTU flashings with a fluid applied roofing and reinforced with polyester mesh. Estimated budget would be $2,000.00. 

Moisture is present and leaking from the east side of the RTU above IT

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:49am
Creator: Josh Rhodes

Ponding that is feeding the IT Leak

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:43am
Creator: Josh Rhodes

Pond from East side.

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:43am
Creator: Josh Rhodes

 

No leaks or ponding to the south

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:43am
Creator: Josh Rhodes

Project: Owasso City Hall Court Leak
Date: 11/4/2024, 9:44am
Creator: Josh Rhodes