Lynn Lane WWTP Blower Building
Completed Project Report
SUMMARY OF WORK PART
1 – GENERAL
1.1 RELATED DOCUMENTS –Broken Arrow WTP Blower Building Roof Replacement
A. Attached, Component sections, forms a component part of this section. Areas of
1. Demo existing roof system down to insulation. Remove all debris from site including overburden. Owner does not wish to keep overburden.
2. Inspect insulation for moisture and replace where saturated.
3. Mechanically attach 1⁄2” secure rock or densdeck coverboard thru existing insulation into metal deck using #15 HD fasteners per wind uplift fastening pattern.
4. Apply Low VOC Aerosol Contact Adhesive/primer to Coverboard in a pattern sufficient to fully adhere 60 MIL TPO membrane to coverboard.
5. Roll membrane with weighted roller to ensure full adhesion of membrane.
6. Install flashing a minimum of 12” above finished roof height. Flashing to extend a minimum of 6” onto field of TPO membrane.
7. Flashings are to be fully adhered to wall with bonding adhesive per manufacturer installation instructions.
8. Base flashings are to be terminated at top with 1” aluminum coated(white) termination bar anchored 8” OC. 22 GA Galvanized Surface mounted counterflashing with caulk trough.
9. Caulk trough to be filled with poly-ether 100% solids sealant (Grey in Color).
10. Install new 22 GA Galvanized scuppers with inside flange of scupper set in mastic.
11. Contractor to provide 5 year workmanship warranty.
12. Manufacturer to provide 20 YR NDL Warranty on entire system from one manufacturer. (not including insulation and coverboard components)
13. Protect all surfaces while performing work and where needed provide temporary surface to operate equipment necessary to perform above mentioned work.
West insulation removed
Project: Lynn Lane Plant Blower Building
Date: 10/23/2024, 10:40am
Creator: Josh Rhodes
Day 1:
1. Demo existing roof system down to insulation. Remove all debris from site including overburden.
2. Inspect insulation for moisture and replace where saturated.
Project: Lynn Lane Plant Blower Building
Date: 10/23/2024, 10:08am
Creator: Josh Rhodes
Project: Lynn Lane Plant Blower Building
Date: 10/23/2024, 10:21am
Creator: Josh Rhodes
Decking was inspected for deficiencies when insulation was replaced.
Project: Lynn Lane Plant Blower Building
Date: 10/24/2024, 9:10am
Creator: Josh Rhodes
Day 2:
3. Mechanically attach 1⁄2” secure rock or densdeck coverboard thru existing insulation into metal deck using #15 HD fasteners per wind uplift fastening pattern.
4. Apply Low VOC Aerosol Contact Adhesive/primer to Coverboard in a pattern sufficient to fully adhere 60 MIL TPO membrane to coverboard.
Project: Lynn Lane Plant Blower Building
Date: 10/24/2024, 10:29am
Creator: Chris Reed
Day 2 Continued
Project: Lynn Lane Plant Blower Building
Date: 10/23/2024, 4:19pm
Creator: Josh Rhodes
Day 2 Night Tie in
Project: Lynn Lane Plant Blower Building
Date: 10/23/2024, 4:19pm
Creator: Josh Rhodes
Day3:
Completion of Project.
5. Roll membrane with weighted roller to ensure full adhesion of membrane.
6. Install flashing a minimum of 12” above finished roof height. Flashing to extend a minimum of 6” onto field of TPO membrane.
7. Flashings are to be fully adhered to wall with bonding adhesive per manufacturer installation instructions.
8. Base flashings are to be terminated at top with 1”…
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:34pm
Creator: Chris Reed
CONTD
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:34pm
Creator: Chris Reed
7. Flashings are to be fully adhered to wall with bonding adhesive per manufacturer installation instructions.
8. Base flashings are to be terminated at top with 1” aluminum coated(white) termination bar anchored 8” OC. 22 GA Galvanized Surface mounted counterflashing with caulk trough.
9. Caulk trough to be filled with poly-ether 100% solids sealant (Grey in Color). 10. Install new 22 GA Galvanized scuppers with inside flange of scupper set in mastic.
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:34pm
Creator: Chris Reed
New Scupper Install
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:34pm
Creator: Chris Reed
CONTD
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:35pm
Creator: Chris Reed
CONTD
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:35pm
Creator: Chris Reed
CONTD
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:35pm
Creator: Chris Reed
CONTD
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:35pm
Creator: Chris Reed
Flag Pole re-attached
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:49pm
Creator: Chris Reed
Flashings installed
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:50pm
Creator: Chris Reed
Contd
Project: Lynn Lane Plant Blower Building
Date: 10/25/2024, 1:50pm
Creator: Chris Reed
Light assembly repaired
Project: Lynn Lane Plant Blower Building
Date: 10/26/2024, 8:09am
Creator: Josh Rhodes Tags: Before and After
Before and After Scupper
Project: Lynn Lane Plant Blower Building
Date: 10/26/2024, 8:14am
Creator: Josh Rhodes Tags: Before and After
Before and After
Project: Lynn Lane Plant Blower Building
Date: 10/26/2024, 8:18am
Creator: Josh Rhodes Tags: Before and After